Principal Electrical Engineer
Woking (hybrid working, mainly home working)
6 months.
The role is outside IR35 and we invite Limited Companies to engage.
The Scope
Services to be supported during the duration of the contract are detailed below. A requirement to undertake additional services shall be mutually agreed by way of contract amendment:
- Preparation of electrical design philosophy and equipment specifications, taking into account:
- Regional factors
- Client Basis of design and design standards
- Participate in and contribute to project workshops including:
- HAZID
- ESOR / SAFOP
- Value Engineering
- Constructability
- Plan and report on work progress
- Prepare man-power forecasts for project management and department head.
- Self-checking deliverables prior to issue.
Deliverables:
Services should be provided, within the agreed schedule, to produce the following deliverables. Where required as part of project specific works, specific clients and durations will be called off as part of the purchase order. Key deliverables to include:
- Design Philosophies
- Equipment Specifications
- Equipment Data sheets
- Load Schedule and Equipment List
- Power Systems Studies
- Input into :
- Cost estimate
- Project execution schedule, plan
- Study close-out report
- FEED scope of work
- Electrical Design Layouts
- Material Take Offs