Technical Advisor Materials Handling Leatherhead, 12 months, Hybrid working
Hybrid working, 3 days office, 2 at home
Principal Materials Engineer for long term work on an FPSO that is in pre-FEED, moving to FEED stage and onwards on an LNG FEED. Project for an initial 12 month contract role that has an immediate start and a target limited company rate to man of circa £60.00 per hour.
The role will be based on 5 days a week in Leatherhead. Hybrid working may be possible with two days remote.
The role is likely to be outside IR35 but the final decision will be made after a Qdos assessment
Required - demonstrable experience authoring mechanical handling reports during different project phases (concept, front end engineering design, and detailed design) in an offshore environment.
The work is to develop the material handling philosophy to minimise material handling, develop a plug and play handling philosophy, liaise with disciplines. Define the number location, capacity or cranes, monorails, davits, gantries, personal or robotics lifts and specialised lifting devices for major equipment.
Outline method description for major equipment handling and high risk operations.